309. iPhone 12 ProMax wide-angle camera signal search method
309. iPhone 12 ProMax wide-angle camera signal search method
Detail
Comments

1

00:00:00,566 --> 00:00:02,500

iPhone camera circuit repairing

2

00:00:03,266 --> 00:00:06,433

This video mainly explains how to find the signals and measurement points

3

00:00:06,433 --> 00:00:09,233

of the iPhone 12 ProMax wide-angle camera

4

00:00:11,633 --> 00:00:17,100

Search methods step 1, find the camera connector in the iPhone 12 ProMax component map

5

00:00:19,933 --> 00:00:23,333

Step 2, determine the position number in the bitmap

6

00:00:25,733 --> 00:00:29,466

Step 3, search for the position number in the circuit diagram,

7

00:00:29,833 --> 00:00:32,000

and find the corresponding signals

8

00:00:39,566 --> 00:00:45,133

Step 4, according to the signals, jump to the bitmap to view the connected components

9

00:00:46,533 --> 00:00:51,000

The voltage and diode value can be measured at the position of the yellow point in the bitmap

10

00:00:52,466 --> 00:00:58,700

When checking the maps, first open the iPhone12Pro Max component map, circuit diagram, and bitmap

11

00:01:00,466 --> 00:01:03,533

Determine the wide-angle camera connector in the component map

12

00:01:05,533 --> 00:01:07,666

In the 12Pro Max component map,

13

00:01:09,433 --> 00:01:13,533

the wide-angle camera connector is the connector on the far right of the mainboard

14

00:01:15,800 --> 00:01:19,533

And determine the position number of the connector in the bitmap

15

00:01:20,133 --> 00:01:23,100

Then search for the position number in the circuit diagram

16

00:01:25,433 --> 00:01:29,333

After finding the camera connector, find the corresponding signals

17

00:01:32,866 --> 00:01:38,400

First look for the 1.8V power supply from camera power supply 1 to the wide-angle camera

18

00:01:39,100 --> 00:01:42,233

Pin 9 of the connector is the 1.8V power supply

19

00:01:42,766 --> 00:01:44,566

Jump to the bitmap according to the name,

20

00:01:45,633 --> 00:01:50,600

the 1.8V power supply is connected to the fuse inductor FL10201,

21

00:01:50,933 --> 00:01:54,166

and connected to the camera power supply U5300

22

00:01:55,900 --> 00:02:00,400

Next, find the I2C detection bus from the camera power supply to the telephoto camera

23

00:02:02,133 --> 00:02:06,033

Pins 15 and 17 of the connector are the I2C detection buses

24

00:02:06,800 --> 00:02:10,100

Pin 15, jump to the bitmap according to the signal name,

25

00:02:10,366 --> 00:02:14,533

it is directly connected to the camera power supply U5300

26

00:02:14,700 --> 00:02:18,266

Pin 17, jump to the bitmap according to the name,

27

00:02:18,566 --> 00:02:21,166

the signal is connected to the camera power supply

28

00:02:22,666 --> 00:02:28,533

Next, look for the 24M clock signal from the camera power supply 2 to the wide-angle camera

29

00:02:29,266 --> 00:02:32,333

Pin 11 of the connector is a 24M clock signal

30

00:02:32,600 --> 00:02:34,433

Jump to the bitmap according to the name,

31

00:02:35,433 --> 00:02:43,600

the clock signal is connected to the fuse resistor R10200 and then connected to the camera power supply 2 U5600

32

00:02:44,900 --> 00:02:49,333

Next, look for the AVDD2 power supply, 3.2V power supply,

33

00:02:49,500 --> 00:02:52,366

1.6V power supply and PVDD power supply

34

00:02:52,366 --> 00:02:57,533

sent by the camera power supply 1, camera power supply 2 and camera power supply conversion tube

35

00:03:00,866 --> 00:03:03,566

Pin 1 of the connector is the PVDD power supply

36

00:03:04,066 --> 00:03:05,933

Jump to the bitmap according to the name,

37

00:03:06,633 --> 00:03:10,366

it is connected to the fuse inductor FL 10200

38

00:03:10,666 --> 00:03:14,966

and connect to the camera power conversion tube U6250

39

00:03:16,133 --> 00:03:19,266

Pin 5 of the connector is the 3.2V power supply

40

00:03:19,433 --> 00:03:21,266

Jump to the bitmap according to the name,

41

00:03:21,500 --> 00:03:25,700

the 3.2V power supply is directly connected to the camera power supply 2,

42

00:03:25,800 --> 00:03:27,733

and there is no fuse in the middle

43

00:03:28,100 --> 00:03:32,200

Pins 19 and 21 of the connector are the 1.6V power supply

44

00:03:32,533 --> 00:03:34,433

Jump to the bitmap according to the name,

45

00:03:35,500 --> 00:03:39,200

it is connected to the fuse resistor R10230,

46

00:03:39,933 --> 00:03:43,666

and connected to the camera power supply after passing through the resistor

47

00:03:44,066 --> 00:03:47,166

Pin 2 of the connector is the AVDD2 power supply

48

00:03:47,666 --> 00:03:49,733

Jump to the bitmap according to the name,

49

00:03:50,466 --> 00:03:55,666

AVDD2 power supply is directly connected to the camera power supply U5300

50

00:03:56,500 --> 00:04:00,733

Let's find the open signal sent by camera power supply 1 to the wide-angle camera

51

00:04:01,600 --> 00:04:04,000

Pin 13 of the connector is the open signal

52

00:04:05,233 --> 00:04:10,166

Jump to the bitmap according to the name, the signal is connected to the camera power supply 1

53

00:04:12,333 --> 00:04:16,633

Let's find the LPDP data bus sent by the wide-angle camera to the CPU

54

00:04:18,666 --> 00:04:25,433

Pins 6, 8, 12, 14, 18, and 20 are the LPDP data buses

55

00:04:27,566 --> 00:04:32,200

When the data bus is connected to the CPU, it will pass through the coupling capacitors

56

00:04:32,500 --> 00:04:37,033

Pin 6, LPDP bus, jump to the bitmap according to the name,

57

00:04:37,500 --> 00:04:41,266

the pin is connected to the coupling capacitor C10211

58

00:04:41,666 --> 00:04:44,933

And connected to the CPU after passing through the capacitor

59

00:04:45,833 --> 00:04:48,800

Pin 8, jump to the bitmap according to the name,

60

00:04:49,166 --> 00:04:52,800

it is connected to the coupling capacitor C10212,

61

00:04:53,000 --> 00:04:56,100

and then connected to the CPU after passing through the capacitor

62

00:04:56,466 --> 00:04:59,400

Pin 12, jump to the bitmap according to the name,

63

00:04:59,933 --> 00:05:03,400

it is connected to the coupling capacitor C10209,

64

00:05:03,700 --> 00:05:06,800

and then connected to the CPU after passing through the capacitor

65

00:05:07,466 --> 00:05:10,400

Pin 14, jump to the bitmap according to the name,

66

00:05:10,966 --> 00:05:14,366

it is connected to the coupling capacitor C10210,

67

00:05:14,600 --> 00:05:17,700

and then connected to the CPU after passing through the capacitor

68

00:05:18,233 --> 00:05:21,233

Pin 18, jump to the bitmap according to the name,

69

00:05:21,666 --> 00:05:25,366

it is connected to the coupling capacitor C10207,

70

00:05:25,600 --> 00:05:28,700

and then connected to the CPU after passing through the capacitor

71

00:05:29,500 --> 00:05:32,466

Pin 20, jump to the bitmap according to the name,

72

00:05:33,000 --> 00:05:36,500

it is connected to the coupling capacitor C10208,

73

00:05:36,866 --> 00:05:39,966

and then connected to the CPU after passing through the capacitor

74

00:05:41,266 --> 00:05:45,766

If one of the coupling capacitors is damaged or missing, the camera cannot be turned on

75

00:05:46,300 --> 00:05:48,000

That's all for this video

No comments yet
Come and write your comments
Links: